Monday, May 20, 2024 at 10:47 AM
This year, we're building a new house. We had originally planned to build it ourselves to save money (my dad would be the general contractor). But it turns that hiring a general contractor will be cheaper. We're still going to be watching everything they do to make sure it is done right. We plan to get the concrete tested too. (to make sure it has enough MPa)
I plan on running Cat6 to every room. I'm also looking at a wall-mounted rack for the router and switches. The holes to fasten it to the wall are exactly 16" apart. That's neat. We can screw it into the studs.