New house : drywall continued

Tuesday, March 4, 2025 at 5:28 PM

They said it would take five days to do the drywall. They will be done tomorrow after three days.

They also over-estimated the number of sheets of drywall needed. Like by 60 or something.

I helped my dad finish the tubing for the home theatre's speakers.

We had planned to insulate the wall of the home theatre with green insulation (for sound), but we only had 24" insulation and the studs are 16" apart. It would have created too much waste. And we probably would not have had enough.

So we just moved the outlets and switches half an inch away from the studs so they can put up two sheets of drywall on that side of the wall. (So three (or four, I'm not sure) sheets in total will be on that wall).

Name
Password

No need to register, just enter the same name and password every time.